...
首页> 外文期刊>Journal of applied mathematics >Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production
【24h】

Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production

机译:钢铁生产无等待调度流程的优化研究与数值模拟

获取原文
获取原文并翻译 | 示例

摘要

This paper considers the m-machine flow shop scheduling problem with the no-wait constraint to minimize total completion time which is the typical model in steel production. First, the asymptotic optimality of the Shortest Processing Time (SPT) first rule is proven for this problem. To further evaluate the performance of the algorithm, a new lower bound with performance guarantee is designed. At the end of the paper, numerical simulations show the effectiveness of the proposed algorithm and lower bound.
机译:本文考虑了无等待约束的m机流水车间调度问题,以使总完成时间最短,这是钢铁生产中的典型模型。首先,针对此问题证明了最短处理时间(SPT)第一规则的渐近最优性。为了进一步评估算法的性能,设计了具有性能保证的新下限。最后,数值仿真表明了该算法的有效性和下限。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号