...
首页> 外文期刊>Japan Metal Bulletin >China West-East Gas Project 2nd Phase to Start in 2007
【24h】

China West-East Gas Project 2nd Phase to Start in 2007

机译:中国西气东输二期工程将于2007年启动

获取原文
获取原文并翻译 | 示例
           

摘要

Chinese major pipeline, West-East Gas Project, which Chinese largest energy firm, China National Petroleum Corporation (CNPC) leads, will officially start the second phase in 2007 after the approval from Chinese National Development and Reform Commission. The project, which needs more than 2.6 million tonnes of steel pipe including 1.6 million tonnes of UOE pipe, is expected to use X80 grade of high strength steel pipe. The project, which uses high grade steel pipe for the first time in Chinese, could benefit Japanese steel makers as plate supplier for UOE pipe.
机译:由中国最大的能源公司,中国石油天然气集团公司(CNPC)牵头的中国主要管道西气东输项目,在获得国家发改委的批准后,将于2007年正式启动第二阶段。该项目需要超过260万吨的钢管,其中包括160万吨的UOE钢管,预计将使用X80级高强度钢管。该项目首次在中文中使用高档钢管,作为UOE钢管的板材供应商,可以使日本钢铁制造商受益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号