...
首页> 外文期刊>Drilling Contractor >Looking deeper for deepwater solutions
【24h】

Looking deeper for deepwater solutions

机译:寻找更深的深水解决方案

获取原文
获取原文并翻译 | 示例

摘要

Over the course of a four-year period, during which approximately 42 wells were constructed by this operator, processes were developed to improve cement slurry design and reduce nonproductive time (NPT) during cementing operations on deepwater wells. Cementing best practices have been well documented for many years. However, not all of these practices are applicable to deep-water operations, especially for the riser-less sections. A systems approach to cover all cement design needs, from conductor to plugging, should be considered. Both conventional and foamed cement slurries can be used when properly designed and placed. Placement design should include a thorough understanding of the static gel development behavior of the drilling fluid.
机译:在四年的过程中,该操作员建造了约42口井,开发了一些工艺,以改善水泥浆设计并减少深水井固井作业期间的非生产时间(NPT)。固井最佳实践已有很多年的文献记载。但是,并非所有这些实践都适用于深水作业,特别是对于无立管段。应该考虑一种系统方法,以满足从导体到插头的所有水泥设计需求。正确设计和放置时,可以使用常规水泥浆和泡沫水泥浆。布置设计应包括对钻井液静态凝胶发育行为的透彻了解。

著录项

  • 来源
    《Drilling Contractor 》 |2006年第1期| 共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 EP;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号