首页> 外文期刊>Drilling Contractor >Mutual respect key to closing generation gap
【24h】

Mutual respect key to closing generation gap

机译:相互尊重是缩小代沟的关键

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

FRESH OUT OF school in 2007 from the University of Oklahoma as a petroleum engineer, Danny Rehg went to Anadarko Petroleum as a drilling engineer for the onshore group in The Woodlands, Texas. Swept immediately into various onshore assets in the company, Mr Rehg was given hands-on experience, his favorite project, working 54 days on a vertical pilot well targeting the Marcellus formation in 2008 in Pennsylvania. "I didn't realize the challenges of actually getting the well drilled, completed and online," Mr Rehg said. "It requires people from all kinds of backgrounds, not just engineers. (In the beginning) I don't think I really appreciated that relationship and the teamwork that's required in the industry to get that done."
机译:丹尼·雷格(Danny Rehg)于2007年从俄克拉荷马大学(University of Oklahoma University)毕业,当时是一名石油工程师,他去了阿那达科石油公司(Anadarko Petroleum),担任得克萨斯州伍德兰兹市陆上集团的钻井工程师。 Rehg先生立即进入公司的各种在岸资产,获得了他最喜欢的项目的动手经验,他在2008年针对宾夕法尼亚州Marcellus地层的垂直试井中进行了54天的工作。雷格说:“我没有意识到实际进行钻井,完井和在线作业所面临的挑战。” “这需要来自各种背景的人,而不仅仅是工程师。(一开始),我不认为我真的很欣赏这种关系以及行业中实现这一目标所需的团队合作。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号