...
首页> 外文期刊>Drilling Contractor >Ecuador completions use ICDs to control early water breakthrough, allow uniform drainage
【24h】

Ecuador completions use ICDs to control early water breakthrough, allow uniform drainage

机译:厄瓜多尔完井工程使用ICD来控制水的早期突破,允许均匀排水

获取原文
获取原文并翻译 | 示例

摘要

PETROAMAZONAS IS making the most of its horizontal wells in Ecuador's Amazon jungle by completing these wells using inflow control devices (ICDs). Awareness of the shortcomings of horizontal wells prompted the company, with the assistance of Schlumberger, to address the issues of early water breakthrough and heterogeneity and permeability contrasts up-front. The result has been higher performance compared with a conventional completion, delay of potential early water breakthrough, no sand production and the efficient restriction of high mobile phases.
机译:PETROAMAZONAS正在使用流入控制装置(ICD)完工厄瓜多尔的亚马逊丛林,以充分利用其水平井。对水平井缺陷的认识促使该公司在斯伦贝谢的帮助下,提前解决了水的突破和异质性和渗透性的问题。与常规完井相比,该结果具有更高的性能,延迟了可能的早期水突破,没有出砂以及对高流动相的有效限制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号