首页> 外文期刊>Drilling Contractor >Drilling optimization enhances development of harsh-environment East Shetland fields
【24h】

Drilling optimization enhances development of harsh-environment East Shetland fields

机译:钻井优化可增强恶劣环境的东设得兰油田的开发

获取原文
获取原文并翻译 | 示例
           

摘要

NEW OPERATOR IN the North Sea EnQuest PLC, which acquired Petrofac Energy Developments Ltd,faced a daunting first drilling project in the northern-most reaches of the East Shetland basin. The goal was to develop the West Don and Don Southwest fields, which were discovered in 1975 but had lain fallow for a third of a century awaiting a commercially viable development plan. The location brought with it harsh environmental challenges. Due to weather conditions in the area, for example, floating rigs can experience serious heave issues. Logistics are also problematic due to weather and the fields' distance from Aberdeen. A typical well construction sequence on a third-generation semi requires 70 to 80 days to execute.
机译:北海的新运营商收购了Petrofac Energy Developments Ltd的EnQuest PLC面临着东设得兰河流域最北端的一个艰巨的第一个钻探项目。目标是开发西Don和西南西南油田,这些油田于1975年被发现,但闲置了三分之一个世纪,等待着商业上可行的发展计划。该位置带来了严峻的环境挑战。例如,由于该地区的天气条件,浮动钻机可能会遇到严重的升沉问题。由于天气以及田地到阿伯丁的距离,物流也成问题。在第三代半钻上进行典型的施工顺序需要70到80天才能完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号