...
首页> 外文期刊>Drilling Contractor >5-part PROC designed to review well-engineering management, emphasizing standardization issues
【24h】

5-part PROC designed to review well-engineering management, emphasizing standardization issues

机译:PROC由5部分组成,旨在审查精心设计的管理,强调标准化问题

获取原文
获取原文并翻译 | 示例

摘要

COORDINATED BY Helder Pinheiro, the third PROPOCO program - Continuous Process Management and Standardization (PROC) - will review the management of current well-engineering processes, especially those related to standardization. It is structured in five sub-projects and will be based on the actual needs of users as well as critical tasks and will deliver a less bureaucratic and fit-for-purpose system. By reviewing the way "lessons learned" are applied and non-conformance events are handled, it will improve the overall efficiency of well-engineering processes.
机译:由Helder Pinheiro协调,第三个PROPOCO计划-持续过程管理和标准化(PROC)-将审查当前精心设计的过程的管理,尤其是与标准化有关的过程。它由五个子项目组成,将基于用户的实际需求以及关键任务,将提供一种不太官僚化且适合目的的系统。通过审查应用“汲取的教训”和处理不合格事件的方式,它将提高精心设计过程的整体效率。

著录项

  • 来源
    《Drilling Contractor 》 |2008年第1期| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 EP;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号