首页> 外文期刊>World Coal >Solving the problem
【24h】

Solving the problem

机译:解决问题

获取原文
获取原文并翻译 | 示例
           

摘要

Hatch has recently undertaken design, procurement, construction and commissioning of a number of overland conveyors, which has reinforced and re-emphasised that robust quality assurance, design systems and methodical and accurate assembly processes are vital in achieving project schedule and ramp-up requirements. It is hoped that the following description of the company's experience in this area will help overland conveyor designers, constructors and operators to improve awareness of certain pitfalls, while assisting in the achievement of project and operational expectations.
机译:Hatch最近进行了许多陆上输送机的设计,采购,建造和调试,这进一步强化并再次强调了可靠的质量保证,设计系统以及有条理的,准确的组装过程对于实现项目进度和启动要求至关重要。希望以下对公司在这一领域经验的描述将有助于陆上输送机的设计者,建造者和操作者提高对某些陷阱的认识,同时有助于实现项目和运营期望。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号