首页> 外文期刊>World Coal >The devil is in the detail
【24h】

The devil is in the detail

机译:细节在于魔鬼

获取原文
获取原文并翻译 | 示例
           

摘要

Continuous mining can seem a particularly attractive option when looking at extracting coal in an underground environment. With rates in the range of 30 - 40 t/minute, it can far exceed the production and productivity capabilities of other methods, making a very compelling case for implementation. It would seem to be an easy business decision. Indeed, there have been numerous instances where this potential has persuaded a mine to jump at the opportunity to bring in this technology, essentially incorporating a new process into an existing infrastructure.
机译:在地下环境中开采煤炭时,连续开采似乎是一个特别有吸引力的选择。速率在30-40吨/分钟的范围内,可以远远超过其他方法的生产能力和生产率,这为实施提供了令人信服的理由。这似乎是一个容易的商业决定。确实,在很多情况下,这种潜力都说服了一家矿山抓住机会引入这项技术,实质上是将新工艺纳入现有基础设施中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号