首页> 外文期刊>World Coal >United States--Black Thunder mine, Thunder Basin Coal Co., Arch Coal Inc
【24h】

United States--Black Thunder mine, Thunder Basin Coal Co., Arch Coal Inc

机译:美国-黑雷矿,雷盆地煤炭公司,Arch Coal Inc

获取原文
获取原文并翻译 | 示例
           

摘要

Arch Coal's Thunder Basin Coal Co., Wyoming, completed the construction of its new Black Thunder mine loadout in November 2008. This modern loadout facility is located nearer to the mine's future reserve base. The facility includes two 17,500 t silos, a truck dump, conveyor corridor, rail spur, yard and loop. The total build-out cost was approximately 100 million US dollars. The new loadout and belt conveyor system will reduce the truck haulage requirements at the mine and has a significantly higher capacity than the 24 million tpa south loadout, which was transferred to Peabody at the end of 2008. The sale of the south loadout to Peabody in 2006 essentially pre-financed Arch's construction costs of the upgraded facility.
机译:Arch Coal的怀俄明州雷德盆地煤炭公司于2008年11月完成了其新的Black Thunder矿山顶矿的建设。这一现代化的顶矿设施位于该矿的未来储备基地附近。该设施包括两个17,500吨的料仓,一个卡车倾卸场,输送机走廊,铁路支线,堆场和环路。建设总费用约为1亿美元。新的装载和皮带输送机系统将减少矿场的卡车运输需求,并且比2008年底转移到Peabody的2400万吨/年的南方装载量要高得多。 2006年基本上为Arch的升级设施的建设费用提供了预付款。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号