【24h】

In sequence

机译:按顺序

获取原文
获取原文并翻译 | 示例
           

摘要

Fluctuations in coal prices, blending and product specifications, rising diesel fuel prices and the potential introduction of an Indonesian coal export tax are all key considerations for coal operators. Changes in economics, taxation and continuously updated reserves require rapid re-evaluation of mine plans and production schedules, as well as the examination of alternative production scenarios on an ongoing basis. This requires a methodology that is rapid, consistent and provably optimal with respect to the entire planning horizon. Indonesian operators face the additional challenge of working with numerous and relatively small seams of varying quality, thereby making an already challenging task more complex in terms of optimisation. Under such conditions, the location and extent of multiple optimal pits cannot be separated from the production schedule and all production related constraints. LOBOS offers a means of integrating decisions relating to the number, size and timing of pits with overall capacity, blending and sequencing decisions without the restrictions normally associated with pit optimisation. This provides a means of rapidly evaluating alternative production and financial scenarios in order to provide a robust mine plan.
机译:煤炭价格波动,混合和产品规格,柴油价格上涨以及可能征收印尼煤炭出口税都是煤炭经营者的主要考虑因素。经济,税收和不断更新的储量的变化要求对矿山计划和生产进度表进行快速重新评估,并不断检查替代生产方案。这就需要相对于整个计划范围而言快速,一致且可证明是最优的方法。印度尼西亚的运营商面临着众多挑战,即要处理数量众多且质量相对较小的相对较小的接缝,从而使本来已经充满挑战的任务在优化方面变得更加复杂。在这种情况下,无法将多个最佳矿坑的位置和范围与生产进度表和所有与生产相关的约束条件区分开。 LOBOS提供了一种方法,可以将与矿坑的数量,大小和时间安排有关的决策与总体能力,混合和排序决策集成在一起,而没有通常与矿坑优化相关的限制。这提供了一种快速评估替代生产和财务方案的方法,以提供可靠的采矿计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号