首页> 外文期刊>World Coal >First of many
【24h】

First of many

机译:首先

获取原文
获取原文并翻译 | 示例
           

摘要

The Ukranian coal mining company Pavlohradvuhillia has launched a new coalface at the Yuvileina mine with a capacity 1000 tpd.The coalface is 225 m with a seam thickness of 0.95 m and pillar length of 1770 m.The company plans to extract 576,00 t from the coalface,which is equipped with a K-80 cutting machine,a KT80 lining and a SP202 VI conveyor.
机译:乌克兰煤炭开采公司Pavlohradvuhillia已在Yuvileina煤矿启动了一个新的采煤工作面,产能为1000吨/天,采煤工作面为225 m,煤层厚度为0.95 m,柱长为1770 m,该公司计划从该矿中提取576,00 t采煤工作面,配有K-80切割机,KT80衬板和SP202 VI输送机。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号