首页> 外文期刊>World Coal >Planning Ahead
【24h】

Planning Ahead

机译:提前计划

获取原文
获取原文并翻译 | 示例
           

摘要

At Cerrejon, Minex is used in the geology area and in all phases of mine planning. Borehole information in a database form is imported into Minex. The raw information is used to create a 3-D geological model that represents a broad range of critical data - not just the volume of the coal and overburden, but also quality parameters (for example, ash, sulphur and calorific value) and a comprehensive mineral analysis. Once the 3-D model is created, verified and accepted, the mine uses Minex to lay out various pit shells and determine the optimal approach to development. The life-of-mine plan, which is updated annually, is rolled out to mid-range planners for five year mine plan sequencing. From there, planners use Minex to produce a detailed month-by-month forecast for the first two years, which becomes Cerrejon's business plan. Finally, short-range planners lay out monthly mine plans for 40 shovels of different sizes and applications, a cyclical process that takes approximately two to three weeks. Detailed weekly and daily plans are also created.
机译:在Cerrejon,Minex用于地质领域和矿山规划的所有阶段。数据库形式的钻孔信息被导入Minex。原始信息用于创建表示广泛关键数据的3-D地质模型-不仅是煤炭和覆盖层的数量,而且还包括质量参数(例如,灰分,硫和热值)以及全面的矿物分析。创建,验证并接受3-D模型后,矿场将使用Minex布置各种矿井壳,并确定最佳的开发方法。矿山寿命计划每年更新一次,并推广给中型计划者,以进行为期五年的矿山计划排序。从那里开始,计划人员使用Minex生成前两年每月的详细月度预测,这成为Cerrejon的业务计划。最后,短期计划人员会针对40个大小和应用不同的铲子制定每月的采矿计划,这是一个周期性的过程,大约需要两到三周的时间。还创建了详细的每周和每日计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号