首页> 外文期刊>World Coal >Aurion Energy releases quarterly report
【24h】

Aurion Energy releases quarterly report

机译:Aurion Energy发布季度报告

获取原文
获取原文并翻译 | 示例
           

摘要

Aurion Energy reports that the second phase of operations at its South Australian Steel and Energy (SASE) pig iron project commenced in February.As part of this project, calling of tenders for the Ingomar coal trial pit has been completed with a contract being awarded to Cooks Construction. Excavation work commenced in March and coal is due to be delivered and prepared for use in the Whyalla Demonstration Plant, beginning in June 2001.
机译:Aurion Energy报告称,其南澳大利亚钢铁和能源(SASE)生铁项目的第二阶段运营于2月开始,作为该项目的一部分,Ingomar煤试验场的招标工作已经完成,并与厨师建设。挖掘工作于3月份开始,煤炭将在2001年6月开始交付并准备在Whyalla示范工厂中使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号