首页> 外文期刊>World Coal >Developing gas
【24h】

Developing gas

机译:产生气

获取原文
获取原文并翻译 | 示例
           

摘要

Molopo Australia NL has embarked on a 10 million AU dollars Phase 1 development programme for the Mungi CBM gas field in Queensland. The first phase of the programme includes 11 wells (nine of which are new), a pipeline and a new compressor capacity. The first gas from the wells is expected in July this year. The drilling programme began last month, with the new wells being brought online over a four-month period. The programme represents approximately 12 percent of Mungi's known gas potential and will be jointly undertaken by Molopo, Oil Company of Australia (Moura) Pty Ltd and Helm Energy-Australia LLC. Through an existing farm-in arrangement with Helm, Molopo will not have to contribute any funds towards the programme.
机译:澳大利亚Molopo NL公司已经启动了一项1000万澳元的第一阶段开发计划,用于昆士兰州的Mungi CBM气田。该计划的第一阶段包括11口井(其中9口是新井),一条管道和一台新的压缩机容量。井中的第一批天然气预计于今年7月发布。钻探计划于上个月开始,新井在四个月内投入使用。该计划约占Mungi已知天然气潜力的12%,将由Molopo,澳大利亚石油公司(Moura)Pty Ltd和Helm Energy-Australia LLC共同承担。通过与Helm的现有农场安排,Molopo不必为此计划提供任何资金。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号