首页> 外文期刊>Drives & Controls >Dual-redundant PLCs control £17m Welsh treatment plant
【24h】

Dual-redundant PLCs control £17m Welsh treatment plant

机译:双冗余PLC控制£ 1700万威尔士污水处理厂

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A £17m project at a water treatment works in North Wales involves more than 1,000 I/O points. The plant is using a redundant control system to ensure reliability. Dee Valley Water's new flagship water treatment works at Llwyn Onn in North Wales, has the capacity to produce 47,000m~3 of drinking water per day for Wrexham and the surrounding area. As well as providing standard treatment processes, the £17m project include an automated system for removing manganese, a mineral that occurs naturally in the surface water in the Dee Valley area.
机译:在北威尔士的一个水处理厂进行的1700万英镑的项目涉及1,000多个I / O点。该工厂正在使用冗余控制系统以确保可靠性。 Dee Valley Water的新旗舰水处理厂位于北威尔士Llwyn Onn,每天可为雷克瑟姆及周边地区生产47,000m〜3的饮用水。除了提供标准的处理程序外,这项耗资1千7百万英镑的项目还包括一个用于去除锰的自动化系统,锰是一种自然存在于迪河谷地区地表水中的矿物质。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号