...
首页> 外文期刊>Drying technology: An International Journal >Vacuum Preloading Combined with Electro-Osmotic Dewatering of Dredger Fill Using Electric Vertical Drains
【24h】

Vacuum Preloading Combined with Electro-Osmotic Dewatering of Dredger Fill Using Electric Vertical Drains

机译:真空预压结合电垂直排水对挖泥船填料进行电渗脱水

获取原文
获取原文并翻译 | 示例

摘要

Based on the vacuum preloading combined electro-osmotic consolidation method, a site comparison trial of vacuum preloading and vacuum preloading in combination with electro-osmotic consolidation was performed on Li Island, Hubei Province. The performance and drainage effects of electric vertical drains were evaluated. The problems were analyzed by monitoring test results. Test results from the field showed that the water content of the dredger fill was greatly reduced and the physico-mechanical properties and bearing capacity were improved significantly after 28 days of treatment by vacuum preloading in combination with electro-osmotic consolidation. Compared with the vacuum preloading method, vacuum preloading in combination with the electro-osmotic consolidation method using electric vertical drains reduced the construction time, saved energy, and achieved an ideal reinforcement effect.
机译:基于真空预压结合电渗固结法,在湖北省黎岛市进行了真空预压和真空预压结合电渗固结的现场对比试验。评估了电动垂直排水系统的性能和排水效果。通过监视测试结果来分析问题。现场测试结果表明,通过真空预压结合电渗固结处理28天后,挖泥机填料的含水量大大降低,物理机械性能和承载力得到显着改善。与真空预压法相比,真空预压结合电垂直排水的电渗固结法减少了施工时间,节约了能源,达到了理想的加固效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号