首页> 外文期刊>China Metal Market: Lead & Zinc & Tin Monthly >Yunnan Jinding: 100,000tpy electrolytic zinc project comes on line on Aug.26
【24h】

Yunnan Jinding: 100,000tpy electrolytic zinc project comes on line on Aug.26

机译:云南金顶:10万吨电解锌项目于8月26日上线

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Yunnan Jinding Zinc Industry Co., Ltd. officially started production of its 100,000tpy electrolytic zinc project on August 26, which enables it to concentrate 2,800 tonnes of primary ores per day and yield 120,000 tonnes of electrolytic zinc per year. And it plans to expand the capacity to 200,00tpy in the future. Yunnan Jinding nov/ controls Lanping Jinding Lead-Zinc Mine - so far the biggest one in Asia, -with a proved reserve of 15.28 million tonnes (metal contained) and a potential economic value of more than 100 billion yuan. Lanping Jinding Lead-Zinc Mine has a long exploration history.
机译:云南金鼎锌业有限公司于8月26日正式开始生产其10万吨/年的电解锌项目,这使其能够每天精矿2800吨原矿,年产12万吨电解锌。并且计划将来将产能扩大到200,00tpy。云南金顶11月底控制着迄今为止最大的亚洲兰坪金顶铅锌矿,探明储量为1528万吨(含金属),潜在经济价值超过1000亿元。兰坪金鼎铅锌矿具有悠久的勘探历史。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号