...
首页> 外文期刊>Zeus syngas refining report >Emirates Steel Launches US$2.4B Two-Phase Expansion, Significantly Increases DRI Capacity
【24h】

Emirates Steel Launches US$2.4B Two-Phase Expansion, Significantly Increases DRI Capacity

机译:阿联酋钢铁(Emirates Steel)推出US $ 2.4B两阶段扩展计划,显着提高DRI容量

获取原文
获取原文并翻译 | 示例
           

摘要

Emirates Steel succeeded this month in rolling out the first steel beams declaring the start of the hot commissioning of the first Heavy Section Mill in the Middle East region at a cost of around US$650 million at its facility in the United Arab Emirates. The company said it can now produce large-size sections, beams, columns and sheet piles. The capacity addition follows large capacity increases in Direct Reduced Iron (DRI) capacity.
机译:阿联酋钢铁公司本月成功推出了第一条钢梁,宣布在阿拉伯联合酋长国的工厂开始热调试中东地区的第一座重型钢厂,耗资约6.5亿美元。该公司表示,现在可以生产大型型材,横梁,立柱和板桩。在直接还原铁(DRI)容量大幅增加之后,增加了容量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号