首页> 外文期刊>Zeus liquefied natural gas report >Total calls for more gas for Gladstone
【24h】

Total calls for more gas for Gladstone

机译:总要求为Gladstone提供更多的天然气

获取原文
获取原文并翻译 | 示例
           

摘要

Speaking to The Australian, Yves-Louis Darricarrere, Total's head of upstream oil and gas, said that the Gladstone LNG (GLNG) project needs to buy more gas. The comments cast doubt on speculation that the project was close to a deal with the Arrow joint venture. As an alternative to buying more gas, however, GLNG was considering acquiring more Queensland exploration ground. Santos, Gladstone's operator, seemingly contradicted Darricarrere's statement, saying that the current gas supply was adequate.
机译:道达尔上游石油和天然气业务负责人伊夫-路易斯·达里卡雷雷(Yves-Louis Darricarrere)在接受澳大利亚采访时说,格拉德斯通液化天然气(GLNG)项目需要购买更多的天然气。这些评论使人们怀疑该项目即将与箭牌合资公司达成协议。但是,作为购买更多天然气的一种选择,GLNG正在考虑收购更多的昆士兰州的勘探场。 Gladstone的运营商Santos似乎与Darricarrere的声明相矛盾,称目前的天然气供应充足。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号