首页> 外文期刊>Zeus liquefied natural gas report >Ukraine advances Yuzny regas terminal
【24h】

Ukraine advances Yuzny regas terminal

机译:乌克兰推进尤兹尼加气站

获取原文
获取原文并翻译 | 示例
           

摘要

Gosinvestproekt, the Ukrainian-state agency for investment and national projects, has signed a memorandum of understanding with Korea Gas Corporation for an LNG-import terminal at Yuzhny, Interfax reported Aug. 29. The ?735 million (US$940 million) terminal project with capacity of some 10 billion cubic meters of gas (Bcrn, approximately 7 million tonnes (mt) of LNG) per year will be built in two phases: During the first, slated to come online in 2016, a vessel with a vaporization capacity of 5 Bern of gas (3.5 mt of LNG) will be moored at the Odessa port. During the second, expected online by yearend 2018, a three tank, 7 mt a year onshore LNG terminal will be constructed.
机译:乌克兰国家投资和国家项目局Gosinvestproekt已与韩国天然气公司就位于尤日内的LNG进口码头签署了谅解备忘录。据国际文传电讯社报道,该项目耗资7.35亿欧元(9.4亿美元),其中包括每年将分两个阶段建造约100亿立方米天然气(Bcrn,约700万吨LNG)的天然气:第一阶段计划于2016年投入使用,其汽化能力为5敖德萨港口将停泊天然气伯尔尼(3.5吨液化天然气)。在第二个预计于2018年底上线的第二年中,将建造一个三罐,年产7吨的陆上LNG接收站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号