首页> 外文期刊>Zeus liquefied natural gas report >Malta issues EOI for LNG import terminal and gas-fired power station development
【24h】

Malta issues EOI for LNG import terminal and gas-fired power station development

机译:马耳他为液化天然气进口站和燃气发电厂的开发颁发意向书

获取原文
获取原文并翻译 | 示例
           

摘要

Enemalta, the state-run electric utility in Malta, has issued an expression of interest (EOI) to build, own and operate an LNG import terminal and gas-fired power station, Argus reported. The power station would produce 200 MW of electricity using a combined-cycle gas turbine. EneMalta wants the terminal and power station to be fully commissioned by spring 2015. The terminal will likely be located onshore, but bids for an offshore, floating terminal will also be considered. The deadline for submissions is May 10.
机译:马耳他国营电力公司Enemalta已发布意向书(EOI),以建造,拥有和经营LNG进口码头和燃气发电站。该发电厂将使用联合循环燃气轮机发电200兆瓦。 EneMalta希望码头和发电站在2015年春季之前全面投入使用。该码头可能位于岸上,但也将考虑对海上浮动码头进行竞标。提交截止日期为5月10日。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号