首页> 外文期刊>Zeus liquefied natural gas report >High costs blamed for Browse delay
【24h】

High costs blamed for Browse delay

机译:高成本归咎于浏览器延迟

获取原文
获取原文并翻译 | 示例
           

摘要

In an interview released on Woodside's website, CEO & Managing Director Peter Coleman explained why his company has decided to delay the Browse LNG at James Price Point near Broome, Western Australia. The Browse development in its current form was granted a retention lease in 2009. The development progressed through a front-end engineering design process and up to and including the consideration of a final investment decision (FID). The company considered the FID and at this point do not believe that it is commercial to proceed. Cost escalation is consistent with other projects in Australia, Coleman said. Unfortunately, costs are such that the current development is not commercial. Various options are being considered for reducing costs and developing the resource, Coleman said.
机译:在Woodside网站上发布的一次采访中,首席执行官兼董事总经理Peter Coleman解释了为什么他的公司决定推迟西澳大利亚布鲁姆附近的James Price Point的Browse LNG。当前形式的Browse开发在2009年获得了保留租赁。该开发过程通过前端工程设计过程进行,直到并考虑了最终投资决策(FID)。该公司考虑了FID,目前还不认为继续进行商业活动。成本上升与澳大利亚的其他项目一致。不幸的是,成本如此之高,以至于目前的发展还没有商业化。科尔曼说,正在考虑各种选择来降低成本和开发资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号