首页> 外文期刊>Zeus liquefied natural gas report >Spectrum applies for gas pipeline right of way
【24h】

Spectrum applies for gas pipeline right of way

机译:频谱申请天然气管道通行权

获取原文
获取原文并翻译 | 示例
           

摘要

Tulsa-based Spectrum Alaska, LLC plans to build a small-scale LNG plant in Alaska's North Slope. As part of the first phase of the project's development, the company recently applied for a right of way application for a 1,100-foot pipeline from the gas supply area to the proposed project site. The 50 MMcf/d pipeline will take approximately a year to build and cost US$30 million to complete, US$22 million in material and US$8 million for construction and installation. The pipeline will cost US$8 million for ongoing operations and maintenance. The pipeline construction will be executed by Anchorage-based CONAM Construction Company. The pipeline will require 12 workers for ongoing operations and 10-15 workers during the construction phase of the pipeline.
机译:位于塔尔萨的Spectrum Alaska,LLC计划在阿拉斯加的北坡建立一个小型液化天然气工厂。作为项目开发第一阶段的一部分,该公司最近为从供气区到拟建项目地点的1,100英尺管道申请了通行权申请。 50 MMcf / d的管道建设将花费大约一年的时间,完成费用为3000万美元,材料费用为2200万美元,施工和安装费用为800万美元。该管道将​​耗资800万美元进行日常运营和维护。管道建​​设将由总部位于安克雷奇的CONAM Construction Company执行。该管道将​​需要12名工人进行日常操作,而在管道的建造阶段则需要10-15名工人。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号