首页> 外文期刊>Zeus liquefied natural gas report >Lithuania Assures FSRU Operational by 2014
【24h】

Lithuania Assures FSRU Operational by 2014

机译:立陶宛确保FSRU到2014年投入运营

获取原文
获取原文并翻译 | 示例
           

摘要

In a company newsletter, Lithuania-based Kiaipedos Nafta said it has selected Fluor to advise the development of the proposed LNG terminal project. "Klaipedos Nafta is responsible for [the] building and development of the terminal, and will make every effort to implement this project," the company general manager, Rokas Masiulis, said. Lithuania will open a tender in October to purchase a floating storage regasifica-tion unit (FSRU). Masiulis estimates the "project value is ?200-300 million [US$285-US$427.5 million]."
机译:立陶宛的Kiaipedos Nafta在公司通讯中表示,已选择福陆(Fluor)为拟议的液化天然气接收站项目的发展提供咨询。该公司总经理Rokas Masiulis表示:“ Klaipedos Nafta负责航站楼的建设和开发,并将尽一切努力实施该项目。”立陶宛将在10月开始招标,以购买浮式储气化装置(FSRU)。 Masiulis估计“项目价值为200到3亿英镑(285美元到4.275亿美元)。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号