首页> 外文期刊>Zeus liquefied natural gas report >New Over the Road Trailer Load Out
【24h】

New Over the Road Trailer Load Out

机译:新的道路拖车装载

获取原文
获取原文并翻译 | 示例
           

摘要

Whatever Fluxys' success with coastal and bunkering tankers will be, the company successfully has launched over-the-road LNG distributions services. In 2010, it opened a trailer loadout facility that can fill as many as 4,000 trailers annually. Overland transport fleets are now serving markets in Continental Europe and the U.K. via ferry with LNG from the Zeebrugge terminal. See photo in Figure 3. The cost to fill a trailer is ?512.20 (US$700), according to Renier, or approximately US$1.00/MMBtu, assuming 36 liquid cubic meters per trailer.
机译:无论Fluxys在沿海和加油船上的成功是什么,该公司都已成功推出了公路LNG分销服务。 2010年,它开设了拖车装载设备,每年可装载多达4,000辆拖车。陆路运输机队现在通过Zeebrugge码头的LNG渡轮服务于欧洲大陆和英国市场。参见图3中的照片。根据Renier的说法,填充一台拖车的成本为512.20英镑(700美元),约合1.00美元/ MMBtu,假设每个拖车为36液体立方米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号