...
首页> 外文期刊>CIM Magazine >Sill pillar recovery at the Louvicourt mine
【24h】

Sill pillar recovery at the Louvicourt mine

机译:Louvicourt矿的门槛支柱恢复

获取原文
获取原文并翻译 | 示例
           

摘要

This paper describes the challenges of mining a sill pillar under various types of paste backfill quality. From 1994 to 2002, Louvicourt mine produced approximately 12,600,000 t grading 3.5% Cu, 1.5% Zn, 27 g/mt Ag, and 0.85 g/mt Au. The mining method is transverse blasthole sloping, mining primary and secondary slopes. The production of this 4,300 t/d operation was accomplished using two mining horizons; from the 655 m level to the 415 m level and from the 860 m level to the 680 m level. The main sill pillar is between the 680 m level and the 655 m level. The second sill pillar is between the 885 m level and the 860 m level representing a quarter of the main sill pillar in size. Since 2002, production has gradually decreased and mining activities are expected to end in mid-2005. The sill pillar production will represent almost 25% of the total mine production. The overall recovery of the sill pillars slopes will be discussed in this paper. To recover the sill pillars, more than 1,500 m of development was planned in or under paste backfill. The first sill pillar slopes under paste backfill were mined out in 2002 with excellent results.
机译:本文描述了在各种类型的糊料回填质量下开采门槛支柱的挑战。从1994年到2002年,Louvourt矿生产了约12,600,000吨,品位为3.5%铜,1.5%锌,27克/吨银和0.85克/吨金。采矿方法是横向爆破孔倾斜,开采主要和次要斜坡。这套4,300吨/日的生产是通过两个采矿层完成的。从655 m高度到415 m高度,从860 m高度到680 m高度。主门槛支柱在680 m和655 m之间。第二个门槛支柱在885 m和860 m高度之间,占主门槛支柱的四分之一。自2002年以来,产量逐渐下降,采矿活动有望在2005年中期结束。基石支柱的产量将占矿山总产量的近25%。窗台柱边坡的整体恢复将在本文中讨论。为了恢复窗台的支柱,计划在浆糊回填中或下方进行1,500 m以上的开发。 2002年,在回填浆糊下开采了第一个门槛支柱斜坡,并取得了出色的效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号