...
首页> 外文期刊>Human Factors and Ergonomics in Manufacturing >Evaluation and Prediction of On-Line Maintenance Workload in Nuclear Power Plants
【24h】

Evaluation and Prediction of On-Line Maintenance Workload in Nuclear Power Plants

机译:核电厂在线维护工作量的评估与预测

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This study evaluates engineers' mental workload while maintaining digital systems in nuclear power plants (NPPs). First, according to the factors affecting the mental workload, a questionnaire was designed to evaluate the mental workload of maintenance engineers at the Second NPP in Taiwan. Then 16 maintenance engineers from the Second NPP participated in the experiment survey. The results indicated that the mental workload was lower in maintaining digital systems than that in analog systems. Finally, a mental workload model based on the neural network technique was established to predict the mental workload of maintenance engineers in maintaining digital systems. Through predicting mental workload, the manager can organize the human resources for each daily task to sustain the appropriate mental workload as well as improve maintenance performance.
机译:这项研究评估了工程师在维护核电站(NPP)中的数字系统的同时的心理工作量。首先,根据影响心理工作量的因素,设计了一份问卷,以评估台湾第二核电厂维修工程师的心理工作量。然后,第二核电厂的16名维护工程师参加了实验调查。结果表明,维护数字系统的精神工作量低于模拟系统。最后,建立了基于神经网络技术的心理工作量模型,以预测维护工程师在维护数字系统中的心理工作量。通过预测心理工作量,经理可以为日常工作组织人力资源,以维持适当的心理工作量并改善维护性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号