首页> 外文期刊>CIM Magazine >Design planned for Fort Hills project
【24h】

Design planned for Fort Hills project

机译:Fort Hills项目的设计计划

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

On June 28, Petro-Canada, on behalf of the Fort Hills Energy L.E, announced their formal design basis for the new Fort Hills Project. Located in Alberta, Fort Hills is an integrated oil sands mining project, which includes a mine and bitumen extraction plant 90 kilometres north of Fort McMurray and an upgrader in Sturgeon County, northeast of Edmonton. "This milestone marks the partner ship's commitment to proceed with the front-end engineering and design (FEED) stage," said Petro-Canada spokesperson Chris Dawson. The FEED stage is expected to take about 12 months, after which a definitive cost estimate will be produced. The final "go-ahead" decision on the project will be based upon that cost estimate.
机译:6月28日,加拿大石油公司代表Fort Hills Energy L.E宣布了新的Fort Hills项目的正式设计基础。 Fort Hills位于艾伯塔省,是一个综合性油砂开采项目,其中包括麦克默里堡以北90公里处的矿山和沥青提取厂,以及埃德蒙顿东北部的斯特金县的升级站。加拿大石油公司发言人克里斯·道森说:“这一里程碑标志着合作伙伴对继续进行前端工程和设计(FEED)阶段的承诺。”预计FEED阶段大约需要12个月,然后将进行最终的成本估算。该项目的最终“超前”决定将基于该成本估算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号