首页> 外文期刊>CIM Bulletin >Environmental impact of blast-emitted noise and air overpressure: prediction and control measures
【24h】

Environmental impact of blast-emitted noise and air overpressure: prediction and control measures

机译:爆炸噪声和空气超压对环境的影响:预测和控制措施

获取原文
获取原文并翻译 | 示例
       

摘要

Noise and airblast are unavoidable by-products of blasting in mines and quarries,affecting all components of the environment. A mining project must recognize the vigorous adverse impacts due to noise and airblast emissions while planning and executing the different stages of the extraction of mineral. The construction and operational stages of the project should be designed managed to best minimize these adverse impacts. The extent of these adverse impacts should be quantified during the execution phase of the project. Based on the predictions of the levels of noise and air overpressure at potentially sensitive locations, the project work should be modified to mitigate the impacts to within acceptable limits. In this paper, the air overpressure data of three different coal mines In India have been analyzed to form a generalized predictor equation. The level of air overpressure can be predicted by the equation, which can provide a guideline to the mine owners to modify their mining activities in order to minimize the adverse impact of noise and air blast.
机译:噪音和爆炸是矿山和采石场爆破不可避免的副产品,影响环境的所有组成部分。采矿项目必须在计划和执行矿产提取的不同阶段时,认识到由于噪声和爆炸产生的强烈不利影响。项目的建设和运营阶段应设计成能最大程度地减少这些不利影响。这些不利影响的程度应在项目执行阶段进行量化。根据对潜在敏感位置的噪声和空气超压水平的预测,应修改项目工作,以将影响减轻到可接受的范围内。本文分析了印度三个不同煤矿的空气超压数据,以形成一个广义的预测方程。空气超压水平可以通过方程式预测,该方程式可以为矿主提供指导,以修改其采矿活动,以最大程度地减少噪声和鼓风的不利影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号