首页> 外文期刊>CIM Bulletin >Engineering techniques to optimize an Arctic mine
【24h】

Engineering techniques to optimize an Arctic mine

机译:优化北极矿山的工程技术

获取原文
获取原文并翻译 | 示例
       

摘要

This paper is a practical overview of ways to reduce cost in the design and operation of an Arctic mine. The economically important issues of the Arctic mine that will be addressed include: permafrost ad the active zone in general terms; road building in and over permafrost; Arctic geotechnical mine design considerations; pit dewatering techniques in subzero temperatures; and blasting frozen materials with techniques to obtain optimal results. A final section on a few special topics conclude this paper.Although this paper primarily refers to near surface conditions more closely associated to an Arctic surface mine, many of the ideas and techniques contained in the paper also apply to the surface construction of an Arctic underground mine.
机译:本文是对降低北极矿山设计和运营成本的方法的实用概述。将要解决的北极矿山在经济上重要的问题包括:永久性冻土和活动区。多年冻土内部和上方的道路建设;北极岩土矿山设计注意事项;零以下温度的矿井脱水技术;并使用技术对冷冻物料进行喷砂处理以获得最佳效果。本文最后总结了一些特殊的主题。尽管本文主要是针对与北极地雷关系更为密切的近地表条件,但本文中包含的许多思想和技术也适用于北极地下地表的建设。矿。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号