...
首页> 外文期刊>Daily Oil Bulletin >Several Apache Horn River Wells To Come On Production By Mid 2010
【24h】

Several Apache Horn River Wells To Come On Production By Mid 2010

机译:到2010年中期,几口Apache Horn River井将投产

获取原文
获取原文并翻译 | 示例
           

摘要

Apache Corporation and its joint venture partner EnCana Corporation plan to have 27 horizontal gross wells on production by the end of the first half of 2010, the Houston-based producer said Thursday. An Apache operated 16-well pad and an EnCana 11-well pad are fully drilled and are awaiting completion operations, which will begin on the Apache operated pad in December with fracing starting in early January, John Crum, president of North America operations, said during a conference call. First production from the pad is expected in April and will ramp up quickly.
机译:这家位于休斯顿的生产商周四表示,Apache公司及其合资伙伴EnCana Corporation计划在2010年上半年之前生产27口水平总井。北美业务总裁约翰·克鲁姆(John Crum)表示,已对Apache作业的16井垫和EnCana 11井的垫层进行了全面钻探,正在等待完井作业,这些作业将从12月在Apache作业的井垫上开始,并于1月初开始。在电话会议期间。垫的第一批生产预计在四月,并将迅速增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号