...
首页> 外文期刊>Daily Oil Bulletin >Nitro Reports Alberta Well Results
【24h】

Nitro Reports Alberta Well Results

机译:Nitro报告艾伯塔省油井结果

获取原文
获取原文并翻译 | 示例
           

摘要

Nitro Petroleum Incorporated says it has completed testing on its first Alberta well. On June 5, Nitro announced it was participating in a two well project. The first well has completed testing. The meters were pulled on June 9th and the well pressured back up to approximately 1100 psi. The data from the meters will be analyzed to get an accurate estimate of reserve potential with the production testing indicating a flow rate of 700 mcf of gas per day including hydrocarbon liquids.
机译:Nitro Petroleum Incorporated表示已完成其第一批艾伯塔省油井的测试。 6月5日,Nitro宣布它正在参加一个两口井项目。第一口井已完成测试。仪表于6月9日被拔出,井压回升至约1100 psi。将对来自仪表的数据进行分析,以获得储量潜力的准确估算,而生产测试表明每天的流量为700 mcf,包括碳氢化合物液体在内的气体。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号