...
首页> 外文期刊>Daily Oil Bulletin >Exall Pipeline Construction Will Boost Production
【24h】

Exall Pipeline Construction Will Boost Production

机译:全面的管道建设将提高产量

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Exall Energy Corporation reports that pipeline approvals have been received and construction has commenced on an 11 kilometre pipeline that will allow unrestricted production from the Marten Mountain 102/14-1 well that was granted Good Production Practice (GPP) status in June 2009.The pipeline and battery facilities are expected to be completed by mid November.Exall has entered into a non-revolving bridge loan facility with an arm's length lender to fund the construction of the pipeline and battery. The loan facility has a maturity of May 31, 2010, bears interest at 12.5% per annum, is subordinate to the company's bank debt and will allow the company to draw up to $2 million.
机译:Exall Energy Corporation报告称已获得一条管道批准,一条11公里长的管道已经开始建设,该管道将允许Marten Mountain 102 / 14-1井的无限制生产,该井在2009年6月被授予良好生产规范(GPP)地位。电池和电池设施预计将于11月中旬完成。Exall已与一家独立的贷方签订了一项非循环桥梁贷款设施,以资助管道和电池的建设。该贷款工具的到期日为2010年5月31日,年利率为12.5%,服从该公司的银行债务,并将允许该公司提取200万美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号