...
首页> 外文期刊>CIS Coal News >Southern Kuzbass to start new coal preparation plant construction in 2012
【24h】

Southern Kuzbass to start new coal preparation plant construction in 2012

机译:库兹巴斯南部将于2012年开始建设新的选煤厂

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Southern Kuzbass (part of Mechel Mining) is implementing a program to increase coal preparation volumes in order toraise its competitiveness. In 2012 the company plans to recommence construction of Sibirginskaya coal preparationplant. The plant has a capacity of 8 mtpy of coal (OS, KS,T ranks). Within the current year the company is planning toprepare the target specification for adjustment of the first stage of the construction project. The company plans tolaunch the first line (4 mtpy of coal) in 2014. The project was developed by Giprougol (Novosibirsk, Russia) in 2009.
机译:南部库兹巴斯(Mechel Mining的一部分)正在实施一项计划,以增加选煤量,以提高其竞争力。该公司计划在2012年重新开始建设Sibirginskaya选煤厂。该工厂的煤炭产能为8 mtpy(OS,KS,T级)。在本年度内,该公司正计划对目标指标进行重新规划,以调整建设项目的第一阶段。该公司计划在2014年启动第一条生产线(4 mtpy煤)。该项目由Giprougol(俄罗斯新西伯利亚)于2009年开发。

著录项

  • 来源
    《CIS Coal News》 |2011年第6期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 冶金工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号