首页> 外文期刊>ZFV: Zeitschrift fur Geodasie, Geoinformation und Landmanagement >Heuristische Echtzeit-Fehlererkennung bei Deformationsmessungen wahrend des Tunnelvortriebs
【24h】

Heuristische Echtzeit-Fehlererkennung bei Deformationsmessungen wahrend des Tunnelvortriebs

机译:隧道施工变形测量中的启发式实时误差检测

获取原文
获取原文并翻译 | 示例
           

摘要

The outlined Certainty Factor method, originally developed in the research area of Knowledge Based Systems, represents an ad hoc concept of quantitative, uncertain reasoning. It is based on numerical values, so called Certainty Factors, expressing the certainty of statements (e.g. about the existence of errors in monitoring data) and an intuitive algorithm processing them to an output certainty (e.g. of a possible error cause). Therefore it allows the representation of and reasoning from the uncertain expert knowledge of a domain. This paper discusses an application of this method for error analysis of displacement data in tunnelling.
机译:概述的确定性方法最初在基于知识的系统的研究领域中开发,代表了定量,不确定推理的特殊概念。它基于数值(所谓的确定性因子)来表达陈述的确定性(例如,有关监视数据中是否存在错误)以及将其处理为输出确定性(例如可能的错误原因)的直观算法。因此,它允许领域的不确定专家知识的表示和推理。本文讨论了该方法在隧道位移数据误差分析中的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号