...
首页> 外文期刊>Hunter Valley Coal Report >Department of Infrastructure, Planning and Natural Resources releases Upper Hunter Strategic Assessment of Coal Mining Potential Report
【24h】

Department of Infrastructure, Planning and Natural Resources releases Upper Hunter Strategic Assessment of Coal Mining Potential Report

机译:基础设施,规划和自然资源部发布《上猎人》煤矿潜力评估报告

获取原文
获取原文并翻译 | 示例
           

摘要

On Tuesday 8 March 2005, DIPNR presented to key stakeholders the outcomes of a strategic assessment on the potential and constraints for coal mining in the Upper Hunter Valley. The report has examined coal mining potential in the area between Aberdeen and Murrurundi, including the area of the current Bickham coal mine proposal southeast of Blandford. Because of the potential impacts of mining at Bickham, the assessment has focused on potential impacts of coal mining on natural resource values, particularly the water resource values and associated conservation values of the Pages River. The study has confirmed the importance of the Pages River to both the environment and other water users and identified the key water resources issues associated with mining at Bickham. These are: will mine pit de-watering lead to an inflow of saline groundwater from the surrounding region, and is the Pages River connected to hard rock aquifers near the proposed mine site?
机译:2005年3月8日星期二,DIPNR向主要利益相关者介绍了关于上猎人谷煤矿开采潜力和制约因素的战略评估结果。该报告研究了阿伯丁和穆鲁伦迪之间地区的煤炭开采潜力,其中包括目前在布兰福德东南部的比克汉姆煤矿提议地区。由于比克汉姆(Bickham)采矿的潜在影响,评估重点是煤矿开采对自然资源价值的潜在影响,特别是佩奇斯河的水资源价值和相关的保护价值。该研究证实了佩奇河对环境和其他用水户的重要性,并确定了与比克汉姆采矿有关的关键水资源问题。它们是:矿井的脱水会导致周围区域的盐水流入吗?Pages河是否与拟建矿场附近的硬岩含水层相连?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号