首页> 外文期刊>Hydrocarbon Processing >Rethink lubrication and steam issues on emergency equipment
【24h】

Rethink lubrication and steam issues on emergency equipment

机译:重新考虑应急设备上的润滑和蒸汽问题

获取原文
获取原文并翻译 | 示例
       

摘要

The March 2011 earthquake and disastrous tsunami in Japan was termed a perfect storm meeting an imperfect design. As we all know, the nuclear power facility's emergency backup generators did not perform as expected. This event serves as an urgent reminder that designing for reliability involves location, selection, configuration, testing, maintenance and adherence to procedures without compromising safety-consciousness-just about everything. Looking back, we may have to ponder and reconsider what it means to be reliability professionals. For a certainty, we will have to re-learn that details matter!
机译:2011年3月的日本地震和灾难性海啸被称为一场完美的风暴,遇到了一个不完善的设计。众所周知,核电站的应急备用发电机的运行不及预期。此事件紧急提醒我们,可靠性设计涉及位置,选择,配置,测试,维护和对过程的遵守,而不会损害安全意识(包括所有方面)。回顾过去,我们可能不得不思考并重新考虑成为可靠性专家的意义。可以肯定的是,我们将不得不重新学习细节问题!

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号