...
首页> 外文期刊>Hunter Valley Coal Report >Northern Energy Corporation has released its Quarterly Report for October/December 2005
【24h】

Northern Energy Corporation has released its Quarterly Report for October/December 2005

机译:北方能源公司(Northern Energy Corporation)发布了2005年10月/ 12月的季度报告

获取原文
获取原文并翻译 | 示例

摘要

Northern Energy Corporation has announced that Phase 2 of the drilling programme at Ashford commenced late in the October/December quarter. The drilling to date has indicated the presence of additional multi-seam intersections in the northern part of the Ashford project area. Further drilling is required to determine the seam structure and coal quality before the implications for additional resources in this part of the project area can be determined. A conceptual study was commenced to examine the development options for the initial 14Mt Inferred Resource at Ashford. Nominal throughput options of 1 and 2 Million Tonnes per year using open cut mining methods and producing a washed coking coal are being evaluated. This study will be completed in the current quarter.
机译:北方能源公司(Northern Energy Corporation)宣布,阿什福德(Ashford)的钻探项目第二阶段已于10月/ 12月季度开始。迄今为止的钻探表明,在阿什福德项目区北部还有其他的多缝交叉口。需要进一步钻探以确定煤层结构和煤质,然后才能确定对项目区域这部分资源的影响。开始进行概念研究,以检查阿什福德最初的14 Mt推断资源的开发方案。目前正在评估使用露天开采法和生产经过洗涤的焦煤的名义年吞吐量分别为100万吨和200万吨。这项研究将在本季度完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号