首页> 外文期刊>Hydrobiologia >Nitrogen loading into anurba estuary:lake pontchartrain (Louisiana,U.S.A.)
【24h】

Nitrogen loading into anurba estuary:lake pontchartrain (Louisiana,U.S.A.)

机译:氮充入阿努尔巴河口:蓬塔雷恩湖(美国路易斯安那州)

获取原文
获取原文并翻译 | 示例
       

摘要

We constructed a nitrogen loading budget for the Lake Pontchartrain watershed located north of New Orleans,Louisiana (U.S.A.).Water quality measurements,discharge estimates,and literature values were used to establish the annual and seasonal variations in loading rates for total nitrogen and nitrate. The relatively stable annual loadings (million kg N) are about 10* that of the pre-settlement nitrogen loading,and come from atmosphere (1.3),the watershed (7.8),pumped urban runoff from New Orleans (1.0),and leakage through the Bonnet Carre flood contro structure (0.5-0.9). Relativley minor additional amounts come from nitrogen fixation in the Lake. Occasional openings of the Bonnet Carre Spillway (for flood protection) could triple the annual average loading within 1-2 months. Proposed samller diversions (for wetland restoration) could raise present N loadings by 50%. The results of water quality management,flood protection and wetland restoration may thus have conflicting effects on the Lake's phytoplankton community,which is primarily nitrogen limited. Lowering the total nitrogen loading,however,seems quite possible,especially given that the present loadings are lamost all reducible through existing technology,especially sewerage treatment. The anlaysis demonstrates that the consequences of ecosystem restoration efforts,continued population growth and flood protection to esturaine nitrogen budgets are intertwined with each other,have a seasonal component,and are changing as plicies evolve.
机译:我们为位于美国路易斯安那州新奥尔良北部的庞恰特雷恩湖流域构建了氮负荷预算。使用水质测量,流量估算和文献数据确定总氮和硝酸盐负荷率的年度和季节性变化。相对稳定的年负荷量(百万千克N)约为沉降前氮负荷量的10 *,来自大气(1.3),分水岭(7.8),新奥尔良的城市径流(1.0)以及通过Bonnet Carre洪水控制结构(0.5-0.9)。 Relativley的少量额外收入来自湖泊中的固氮作用。 Bonnet Carre溢洪道的偶尔开放(用于防洪)可能会在1-2个月内使年平均载重量增加两倍。拟议的沙姆勒改道(用于湿地恢复)可使目前的氮负荷提高50%。因此,水质管理,防洪和恢复湿地的结果可能对湖泊的浮游植物群落产生冲突的影响,而浮游植物的群落主要是氮。然而,降低总氮负荷似乎是很有可能的,尤其是考虑到目前的负荷几乎可以通过现有技术(尤其是污水处理)降低。分析表明,生态系统恢复工作,人口的持续增长和防洪对江口氮预算的影响相互交织在一起,具有季节性成分,并且随着政策的发展而变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号