首页> 外文期刊>Hot Dip Galvanizing >Perforated 3D facade
【24h】

Perforated 3D facade

机译:穿孔3D立面

获取原文
获取原文并翻译 | 示例
           

摘要

The Malilla Sports Centre in Valencia forms part of an important urban infrastructure plan managed by the regional government. The project is based on an initiative from the Valencia Municipal Sports Federation, which has been taken up by the Valencia Region Sports Council, to develop the existing facilities in this suburb. The project was designed to meet within the strictest architectural and technical standards laid down by the regulations currently in force.
机译:巴伦西亚的Malilla体育中心是地区政府管理的重要城市基础设施计划的一部分。该项目基于瓦伦西亚市体育联合会的一项倡议,该倡议已由瓦伦西亚地区体育理事会接受,旨在开发该郊区的现有设施。该项目旨在满足当前有效法规所规定的最严格的建筑和技术标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号