Medical Data Center Controls Uptime, Energy With Variable-Frequency Drives: Cut energy use 40% by controlling CRAC fan speed

机译:医疗数据中心通过变频驱动器控制正常运行时间和能源:通过控制CRAC风扇速度将能耗降低40%

获取原文
获取原文并翻译 | 示例
       

摘要

At a medical data center in the upper Midwest, cooling-system uptime reliability is ensured with redundant computer-room air-conditioning (CRAC) units. For example, in a room needing eight units, 10 are employed. "Under normal conditions, we're using 80 percent of the installed capacity to cool the room, which is about a 30-percent turndown," the data-center manager said.
机译:在中西部中部的一个医疗数据中心,冗余的机房空调(CRAC)单元确保了冷却系统正常运行的可靠性。例如,在需要八个单元的房间中,采用了十个单元。数据中心经理说:“在正常情况下,我们将使用装机容量的80%为房间降温,这大约降低了30%。”