首页> 外文期刊>HPAC engineering >Natatorium Dehumidification System Goes Beyond Humidity Control: Controls temperature, heats pool water, and more
【24h】

Natatorium Dehumidification System Goes Beyond Humidity Control: Controls temperature, heats pool water, and more

机译:游泳馆除湿系统超越了湿度控制:控制温度,加热池水等

获取原文
获取原文并翻译 | 示例
           

摘要

An independent school serving more than 1,700 boys and girls from the Atlanta area, The Westminster Schools had a tradition of excellence to uphold in the design and construction of a new natatorium. The old Turner Gymnasium, a six-lane pool and gymnasium facility, was praised in 1970 as "the city's finest" by The Atlanta Journal- Constitution. Construction of the new Turner Gymnasium began in 1999. The natatorium was to include a 17-lane pool with diving area, as well as stadium seating in two balconies. Plans called for the pool to hold 500,000 gal of water in a space of approximately 167,000 sq ft. "This was a high-profile project in the community at a high-profile institution," Ben Davenport, an associate partner at Newcomb & Boyd, the consulting engineering firm for the project, said. "The opportunity for failure was not an option. Everything had to work right."
机译:威斯敏斯特学校是一所独立的学校,为亚特兰大地区的1,700多个男孩和女孩提供服务,该校秉承着卓越的传统,致力于设计和建造新的游泳馆。老的特纳体育馆是一个六车道的游泳池和体育馆,1970年被《亚特兰大宪法》誉为“全市最好的”。新的特纳体育馆的建设始于1999年。游泳馆将包括一个带潜水区的17车道游泳池,以及两个阳台上的体育场座位。计划要求该游泳池在约167,000平方英尺的空间中容纳500,000加仑的水。“这是一家知名机构在社区中一项备受瞩目的项目,” Newcomb&Boyd的合伙人Ben Davenport说,该项目的咨询工程公司表示。 “失败的机会不是一个选择。一切都必须正常进行。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号