...
首页> 外文期刊>Chemical Engineering World >CNPC commences operations at second Sulige gas processing plant
【24h】

CNPC commences operations at second Sulige gas processing plant

机译:中石油在苏里格第二座天然气处理厂开始运营

获取原文
获取原文并翻译 | 示例
           

摘要

China:The China National Petroleum Corporation(CNPC)has placed a second natural gas processing plant serving the Sulige field into operation,in order to carry natural gas directly to Beijing through the second Shaan-Jing gas pipeline.The CNPC gas plant,comprising three sets of deoiling and dehydration units,six sets of gas compressors,and auxiliary facilities such as flare stacks,has an annual processing capacity of five billion cubic meters(bcm)and is reportedly the largest of its kind in China.The first plant,which went onstream in 2006,has an annual processing capacity of three billion cubic meters.
机译:中国:中国石油天然气集团公司(CNPC)已为苏里格气田提供服务的第二座天然气加工厂投入运营,目的是通过第二条陕京天然气管道将天然气直接运送到北京。套脱水和脱水装置,六套气体压缩机以及火炬烟囱等辅助设施,年处理能力为50亿立方米(bcm),据报道是中国同类工厂中规模最大的。于2006年投产,年处理能力为30亿立方米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号