Peter Kinsey, Pipeline Construction HAZID Specialist, considers risk mitigation necessary for winter preparation of a pipeline spread. Pipeline construction is undertaken in a linear process - as an assembly line - moving along a right-of-way (ROW) corridor, exposed to changing weather and constantly changing soil conditions underfoot. If your project management does not take adequate precautions, the transition from summer to winter conditions can negatively impact many of the work processes in the mobile assembly line. A project management team lacking experience in winter construction will be unable to control the subsequent disruptions in production, such as but not limited to: 1. Equipment on the ROW being rendered inaccessible, inoperable and/or uncontrollable. 2. ROW being inaccessible to work crews and equipment. 3. Loss of life of project workers and the public. 4. Failure to meet contract scheduled construction milestones. 5. Postponed gas-in delivery dates with significant financial losses. 6. Loss of EPCM, client and contractor company and management reputations.
机译:管道施工危险性专家Peter Kinsey认为,在冬季进行管道扩展时,必须降低风险。管道建​​设是作为装配线的线性过程,它沿着一条通行的(ROW)走廊移动,暴露于不断变化的天气和脚下不断变化的土壤条件下。如果您的项目管理人员未采取足够的预防措施,那么从夏季到冬季的过渡可能会对移动装配线中的许多工作流程产生负面影响。缺乏冬季施工经验的项目管理团队将无法控制随后的生产中断,例如但不限于:1. ROW上的设备变得不可访问,不可操作和/或不可控制。 2.工作人员和设备无法接近ROW。 3.项目人员和公众的生命损失。 4.未达到合同预定的建设里程碑。 5.加油交货日期推迟,造成重大财务损失。 6. EPCM,客户和承包商公司以及管理声誉的损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号