...
首页> 外文期刊>World Oil >POST-REMOVAL TESTING CONFIRMS ROBUSTNESS OF TOP TENSION RISER SYSTEMS
【24h】

POST-REMOVAL TESTING CONFIRMS ROBUSTNESS OF TOP TENSION RISER SYSTEMS

机译:拆卸后的测试确认了顶部张力提升系统的坚固性

获取原文
获取原文并翻译 | 示例

摘要

After approximately 10 years of service in the GOM's Green Canyon region, Anadarko decided to recover components of the top tension riser (TTR) system from the Constitution truss spar, following the abandonment of two wells in approximately 5,000 ft of water. The recovery would give Anadarko an opportunity to assess expected in-service wear that occurred on the TTRs, as well as estimate the remaining service life. Along with Vallourec providing 12 3/4-in. T95 pipe, the primary connector was the VAM TTR, used as the outer production riser. The first production TTR was run in 2006 and 2007.
机译:在GOM的Green Canyon地区服务了大约10年之后,Anadarko决定在大约5,000英尺的水中放弃两口井后,从体格桁架中恢复顶部张力提升器(TTR)系统的组件。复苏将使阿纳达科有机会评估TTR上预期的服役中的磨损,并估算剩余使用寿命。与Vallourec一起提供12 3 / 4-in。 T95管道,主要接头是VAM TTR,用作外部生产立管。首次生产TTR于2006和2007年进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号