...
首页> 外文期刊>World Journal of Science, Technology and Sustainable Development >Reducing waste to landfill in the UK: identifying impediments and critical solutions
【24h】

Reducing waste to landfill in the UK: identifying impediments and critical solutions

机译:减少英国的垃圾填埋场:确定障碍和关键解决方案

获取原文
获取原文并翻译 | 示例

摘要

The UK construction industry produces up to one third of all waste to landfill. This study aims to identify specific project practices impeding the reduction of waste in construction projects as well as uncovering potential waste solutions throughout the project delivery process. The rationale being that for such a drastic reduction in waste to landfill, holistic and extensive measures would be required. Design/methodology/approach - A two-way methodological approach was used. This comprised qualitative unstructured interviews and a quantitative questionnaire survey of three major stakeholders in the UK construction industry: clients, architects and contractors. Findings - Design factors remain the major cause of impediments to waste reduction to landfill. Critical impediments include clients making waste prevention a top priority in projects, overly complex designs, waste taking a low priority compared to project time and costs, lack of concerns by designers for buildability, among others. Critical solutions include early supply chain involvement in design process, choosing materials for their durability, early communication of design changes to all parties, longer project programmes and better lead times, among others. Practical implications - In all, the target of halving construction waste to landfill based on the 2008 benchmark is achievable but would require construction companies to take it upon themselves to implement the proposed solutions suggested by this study. Originality/value - The value of this research is to provide UK construction companies with solutions to reduce waste and aid the reaching of the landfill target, as landfill is decreasing as a solution to waste. In addition the cost savings on reducing waste could be crucial for companies in this current economic climate.
机译:英国建筑业产生的垃圾中有多达三分之一是垃圾填埋场。这项研究旨在确定阻碍减少建筑项目废物的具体项目实践,并在整个项目交付过程中发现潜在的废物解决方案。这样做的理由是,要大幅度减少垃圾填埋场,就需要采取整体而广泛的措施。设计/方法/方法-使用了两种方法。这包括定性的非结构化访谈和对英国建筑业三个主要利益相关者的定量问卷调查:客户,建筑师和承包商。调查结果-设计因素仍然是减少垃圾填埋的主要障碍。关键的障碍包括:客户将预防浪费作为项目的重中之重;设计过于复杂;与项目时间和成本相比,浪费的优先性低;设计师缺乏对可构建性的关注等。关键解决方案包括供应链尽早参与设计过程,选择材料以确保其耐用性,及早与各方沟通设计变更,更长的项目计划和更好的交付时间等。实际意义-总而言之,以2008年基准为基础将建筑垃圾减少一半的目标是可以实现的,但将要求建筑公司自行承担实施本研究建议的解决方案的目标。原创性/价值-这项研究的价值是为英国建筑公司提供解决方案,以减少浪费并帮助实现垃圾填埋目标,因为垃圾填埋作为一种解决方案正在减少。此外,在当前的经济形势下,减少浪费的成本节约对于公司至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号