首页> 外文期刊>World Gas Intelligence >Tepco Poised To Restart First Of Long-Closed Nuclear Units
【24h】

Tepco Poised To Restart First Of Long-Closed Nuclear Units

机译:东京电力准备重新启动长期关闭的核单位

获取原文
获取原文并翻译 | 示例
           

摘要

The spot LNG purchasing by Tokyo Electric Power Co.(Tepco)that propped up global LNG markets over much of the last year could be approaching an end if the utility succeeds in ongoing efforts to bring one unit of the mammoth Kashiwazaki-Kariwa nuclear power complex back on line early this year(WGI Nov.l2,p8).A successful restart of Unit 7,where fuel reloading began in November,would pave the way for bringing the other six units back into operation,ahead of previous forecasts by Japanese safety regulators that the entire facility would remain out of operation at least into 2010.
机译:如果东京电力公司(Tepco)成功进行持续努力以建造庞大的柏崎崎-ari轮核电站之一,那么东京电力公司(Tepco)的现货LNG采购将在去年的大部分时间支撑全球LNG市场。 WGI于今年11月12日重返生产线。第7机组的成功重启(11月份开始进行燃料加注)将为其他六台机组重新投入运营铺平道路,这是日本安全局先前的预测监管机构认为,整个设施至少要到2010年才能停止运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号