...
首页> 外文期刊>World Gold Analyst >Hope Bay Drilling Update from Miramar
【24h】

Hope Bay Drilling Update from Miramar

机译:Miramar的Hope Bay钻井更新

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Miramar Mining Corporation has announced results for an additional 21 diamond drill holes from the 2007 exploration programme at the Hope Bay project in Nunavut, Canada. There are now seven core drills working at Hope Bay; with four drills coring from lake ice at the Suluk and Rand zones of the Madrid deposit and with a single drill is testing the Boston BN Zone. The search for new deposits has also begun with two drills testing priority exploration targets on the 21 km long Madrid trend. As reported in the June edition of WGA, the objectives of the 2007 exploration campaign are to advance the deposits towards completion of a feasibility study for Phase II production. The current resource for the combined Madrid deposits contains 7.5 Moz gold in the Indicated and Inferred categories.
机译:美丽华矿业公司(Miramar Mining Corporation)宣布了2007年加拿大努纳武特(Nunavut)希望湾项目勘探计划中另外21个金刚石钻孔的结果。现在,在希望湾有7个核心演习。在马德里矿床的Suluk和Rand地区,有4个钻头从湖冰上取了芯,还有一个钻头正在测试Boston BN区。寻找新矿床的工作也从在21公里长的马德里趋势中进行两次钻探测试优先勘探目标开始。正如WGA六月版所报道的那样,2007年勘探活动的目标是将矿床推进到完成第二阶段生产可行性研究的水平。马德里合并矿床的当前资源包括7.5和2莫兹金(指示和推断类别)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号