首页> 外文期刊>Western Contractor >Spillway works lift dam safety margin
【24h】

Spillway works lift dam safety margin

机译:溢洪道工程提升大坝的安全裕度

获取原文
获取原文并翻译 | 示例
           

摘要

When it was built over 40 years ago to cope with Perth's booming industrial and population growth, the Serpentine Dam was planned and constructed to be able to cope with a one in 10,000 year flood - then the accepted world standard for large dams.As a result of a 10 million dollars upgrade just completed by Leighton Contractors for Western Australia's Water Corporation, the safety margin at the dam near Jarrahdale, about 55km south-east of Perth, has now been lifted to at least ten times this value.
机译:为了应对珀斯蓬勃发展的工业和人口增长而建造的40年前,蛇形水坝的设计和建造能够应对10,000年的洪水-当时公认的大型水坝世界标准。礼顿承包商刚刚为西澳大利亚州供水公司完成的一千万澳元升级工程中,珀斯东南约55公里处贾拉代尔附近水坝的安全裕度现已提高到该值的至少十倍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号